ANSI/ASME B30.5 Mobile and Locomotive Cranes Safety Audit Checklist

A detailed checklist for auditing mobile and locomotive crane safety practices and ensuring compliance with ANSI/ASME B30.5 standards in construction and industrial projects

Get Template

About This Checklist

Enhance mobile and locomotive crane safety with our comprehensive ANSI/ASME B30.5 Mobile and Locomotive Cranes Safety Audit Checklist. This essential tool assists crane operators, safety managers, and site supervisors in ensuring compliance with ANSI/ASME B30.5 standards, identifying potential hazards, and maintaining safe crane operations. By systematically addressing key aspects of mobile and locomotive crane safety, this checklist helps prevent accidents, protects workers and equipment, and improves overall operational efficiency in construction, industrial, and infrastructure projects.

Learn more

Industry

Construction

Standard

ANSI/ASME B30.5 - Mobile Cranes

Workspaces

Construction Sites

Occupations

Crane Operator
Safety Manager
Site Supervisor
Certified Crane Inspector
Rigging Specialist
1
Is the crane currently certified for use?
2
What is the maximum load capacity of the crane?
Min: 0
Target: 10000
Max: 50000
3
Has the crane operator completed the required training?
4
Is the crane maintenance up to date?
5
List any safety violations observed during the inspection.
6
Have all operational checks been performed on the crane?
7
What is the current wind speed at the site?
Min: 0
Target: 20
Max: 100
8
Are all personnel wearing the required safety gear?
9
What is the date of the last crane inspection?
10
Any additional comments from the crane operator?
11
Have emergency procedures been reviewed with all personnel?
12
What is the weight of the load being lifted?
Min: 0
Target: 8000
Max: 50000
13
Are all safety signs and signals visible and clear?
14
What time did the crane operations commence today?
15
Describe any incidents or near-misses that occurred during operations.
16
Is the crane operator certified and authorized to operate the crane?
17
How frequently should the crane be inspected?
Min: 1
Target: 30
Max: 365
18
Are all workers in the vicinity wearing appropriate PPE?
19
What is the date for the next scheduled maintenance?
20
Provide details on the safety training records for personnel involved in crane operations.
21
Has a site safety assessment been conducted before crane operations?
22
What is the total height to which the load will be lifted?
Min: 0
Target: 15
Max: 100
23
Is a designated signal person present during operations?
24
What time is the daily safety briefing held?
25
Document any observations or recommendations from today's operations.

FAQs

This checklist specifically addresses the ANSI/ASME B30.5 standard, which covers safety requirements for mobile and locomotive cranes.

Mobile and locomotive crane safety audits should be conducted daily before operations begin, after any configuration changes, and at regular intervals as specified by the manufacturer and ANSI/ASME B30.5 standard.

The checklist covers areas such as crane structural components, hydraulic systems, wire ropes and reeving, load charts, operator controls, safety devices, outrigger deployment, ground conditions, and operator qualifications.

A qualified person, typically a certified crane inspector or competent operator familiar with ANSI/ASME B30.5 standards, should be responsible for conducting the crane safety audit.

By ensuring proper crane setup, operation, and maintenance, this checklist significantly reduces the risk of crane accidents, improves lifting operation efficiency, and helps maintain a safe working environment for all personnel on the project site.

Benefits of ANSI/ASME B30.5 Mobile and Locomotive Cranes Safety Audit Checklist

Ensures compliance with ANSI/ASME B30.5 mobile and locomotive crane safety standards

Reduces the risk of crane-related accidents and equipment damage

Improves overall site safety during lifting operations

Helps identify and address potential mechanical and operational issues

Facilitates proper crane inspection, maintenance, and operation procedures