This is an info Alert.
Single logo
  • Product
  • Templates Library
  • Generate AI Checklist
  • Resources
  • Pricing
LoginSign Up
Full logo

Patika Global Technology Ltd.

167-169 Great Portland Street, 5th floor, London, W1W 5PF

2025 Audit Now © ALL RIGHTS RESERVED
ProductTemplates LibraryGenerate AI Checklist
ResourcesSupportPricing

Subscribe to Our Newsletter

​
App StorePlay Store
Privacy PolicyTerms Of Service
2025 Audit Now © ALL RIGHTS RESERVED

ARP4754A Process Assurance Audit Checklist

This checklist is designed to audit and ensure compliance with the process assurance requirements outlined in SAE ARP4754A for aviation systems development.

ARP4754A Process Assurance Audit Checklist

by: audit-now
4.4

Get Template

About This Checklist

The ARP4754A Process Assurance Audit Checklist is a crucial tool for ensuring the integrity and effectiveness of development processes in aviation systems. This checklist, aligned with the SAE ARP4754A standard, focuses on the critical aspects of process assurance throughout the aircraft and systems development lifecycle. By providing a structured approach to auditing development processes, it helps aviation professionals maintain consistency, quality, and compliance in their methodologies. Implementing this checklist can significantly improve process reliability, enhance product quality, and support efficient certification efforts in the aviation industry.

Learn more

Industry

Aerospace and Defense

Standard

SAE ARP4754A - Aircraft Development Process

Workspaces

Aircraft Design Offices

Occupations

Quality Assurance Manager
Process Engineer
Systems Engineer
Project Manager
Certification Specialist
1
Is the development process compliant with SAE ARP4754A standards?
2
What is the percentage of quality control metrics met during the development phase?
​
Min: 0
Target: 100
Max: 100
3
List any continuous improvement actions taken during the project.
​
4
When was the last certification review conducted?
​
5
What is the defect density per 1000 lines of code in the current phase?
​
Min: 0
Target: 5
Max: 50
6
Have all regulatory compliance checks been completed?
7
Have there been any significant changes to the project scope?
​
8
When was the last configuration review conducted?
​
9
Is the technical documentation for the current phase up to date?
​
10
Are all suppliers compliant with the required standards?
11
How many change requests have been submitted during this phase?
​
Min: 0
Target: 0
Max: 100
12
When was the last safety audit conducted?
​

FAQs

This checklist focuses on the process assurance aspects of ARP4754A, including planning, execution, review, and improvement of development processes across all stages of the system lifecycle.

By ensuring robust and consistent development processes, this checklist helps prevent process-related errors and oversights that could potentially impact system safety.

The primary users are quality assurance managers, process engineers, systems engineers, and project managers involved in aircraft systems development and certification.

This checklist should be applied continuously throughout the development lifecycle, from initial planning stages through to final verification and validation processes.

The checklist includes items to verify that processes for collecting metrics, analyzing performance, and implementing improvements are in place, supporting a culture of continuous process improvement.

Benefits of ARP4754A Process Assurance Audit Checklist

Ensures compliance with ARP4754A process assurance guidelines

Improves consistency and quality of development processes

Enhances traceability and documentation of process activities

Facilitates early detection of process deviations and inefficiencies

Supports streamlined certification by demonstrating robust process controls