ARP4754A Requirements Management and Traceability Audit Checklist

This checklist is designed to audit and ensure compliance with the requirements management and traceability processes outlined in SAE ARP4754A for aviation systems development.

Get Template

About This Checklist

The ARP4754A Requirements Management and Traceability Audit Checklist is an indispensable tool for ensuring robust requirements handling in aviation systems development. This checklist, aligned with the SAE ARP4754A standard, focuses on the critical aspects of requirements definition, management, and traceability throughout the aircraft system development lifecycle. By providing a structured approach to auditing these processes, it helps aviation professionals maintain clear, consistent, and traceable requirements, which are fundamental to developing safe and compliant aircraft systems. Implementing this checklist can significantly improve requirements quality, enhance system integration, and streamline verification and validation processes in the aviation industry.

Learn more

Industry

Aerospace and Defense

Standard

SAE ARP4754A - Aircraft Development Process

Workspaces

Aircraft Systems Engineering Office

Occupations

Requirements Engineer
Systems Engineer
Project Manager
Quality Assurance Specialist
Certification Engineer
1
Is there a documented traceability process for all requirements?
2
Are all requirements documented in accordance with ARP4754A standards?
3
How many requirements have been verified?
Min: 0
Target: 100
Max: 1000
4
Is there a process in place for managing requirement changes?
5
Is the verification process for requirements being followed?
6
What challenges have been encountered during system integration?
7
How often are requirements reviews conducted?
8
Are stakeholders involved in the requirements management process?
9
How many requirements remain unverified?
Min: 0
Target: 0
Max: 100
10
Has a requirements baseline been established?
11
What justifications are provided for changes to requirements?
12
When was the last requirement updated?
13
What is the current compliance level of requirements with ARP4754A?
14
What sources were used to derive the requirements?
15
What is the rate of changes made to requirements during the project?
Min: 0
Target: 5
Max: 50
16
Is there a formal process for reviewing requirements?
17
What lessons have been learned from the requirements management process so far?
18
When is the next review of the requirements scheduled?
19
What percentage of requirements are currently traceable?
20
Describe the process used for validating requirements.
21
How many instances of rework have occurred due to requirement changes?
Min: 0
Target: 2
Max: 100
22
Is there a process for obtaining stakeholder approval for requirements?
23
What feedback have stakeholders provided regarding the requirements?
24
When was the last meeting held with stakeholders regarding requirements?
25
How complete is the documentation for all requirements?
26
What is the history of changes made to key requirements?
27
What is the total number of requirements identified for the project?
Min: 0
Target: 150
Max: 500
28
Has a risk assessment been conducted for the identified requirements?
29
What issues have been encountered in the requirements management process?
30
When is the next audit of the requirements management process scheduled?

FAQs

This checklist focuses on the requirements management and traceability aspects of ARP4754A, including requirements capture, allocation, derivation, and verification processes.

By ensuring clear, complete, and traceable requirements, this checklist helps prevent requirements-related errors that could lead to safety issues in aircraft systems.

This checklist should be used by requirements engineers, systems engineers, project managers, and quality assurance personnel involved in aircraft systems development.

This checklist is most useful during the requirements definition phase, system design phase, and throughout the development process for requirements change management and traceability verification.

By ensuring proper requirements management and traceability, this checklist helps in generating clear evidence of compliance with ARP4754A, which is crucial for the certification process.

Benefits of ARP4754A Requirements Management and Traceability Audit Checklist

Ensures compliance with ARP4754A requirements management guidelines

Improves clarity and consistency of system requirements

Enhances traceability from high-level to low-level requirements

Facilitates more efficient verification and validation processes

Reduces risks associated with requirements-related errors in system development