NADCAP Coatings and Paint Application Audit Checklist

A comprehensive audit checklist for coatings and paint application operations in aerospace manufacturing, ensuring compliance with NADCAP standards and optimizing quality control in the production of durable and high-performance surface finishes for aerospace components.

NADCAP Coatings and Paint Application Audit Checklist
by: audit-now
4.8

Get Template

About This Checklist

The NADCAP Coatings and Paint Application Audit Checklist is an essential tool for aerospace and defense manufacturers involved in surface finishing processes. This comprehensive checklist addresses critical aspects of coating and painting operations, including surface preparation, paint mixing, application techniques, curing processes, and quality control measures. By implementing this checklist, organizations can effectively evaluate their coating and painting processes, ensure compliance with stringent aerospace standards, and maintain the highest level of quality in producing corrosion-resistant and aesthetically pleasing aerospace components. Regular use of this checklist helps companies streamline their audit preparation, optimize coating parameters, and enhance the overall durability and performance of aerospace finishes.

Learn more

Industry

Aerospace and Defense

Standard

NADCAP

Workspaces

Paint and Coating Facility

Occupations

Coating Application Specialist
Paint Formulation Chemist
Quality Control Inspector
NADCAP Auditor
Corrosion Protection Engineer

Aerospace Coatings and Paint Application Audit

(0 / 6)

1
Is the environmental testing compliant with standards?

Select compliance status.

To verify compliance with environmental regulations.
2
What was the date of the last paint curing process?

Enter the date of the last curing process.

To track paint curing practices and ensure compliance.
3
Are corrosion protection standards being met?

Select true if standards are met, false otherwise.

To ensure compliance with corrosion protection requirements.
4
What observations were made during surface preparation?

Provide detailed notes.

To document any issues or best practices in surface preparation.
5
What is the paint mixing compliance score?

Enter the compliance score (1-5).

To evaluate adherence to paint mixing standards.
Min: 1
Target: 5
Max: 5
6
Is the coating thickness within the specified limits?

Select compliance status.

Ensures compliance with industry standards for coating thickness.
7
Is the waste management process compliant with regulations?

Select compliance status.

To verify adherence to waste management standards in the facility.
8
When was the last calibration of the application equipment?

Enter the date of the last calibration.

To ensure that equipment is properly calibrated for optimal performance.
9
Were all safety protocols followed during the paint application?

Select true if protocols were followed, false otherwise.

To ensure that safety procedures are adhered to during operations.
10
What is the condition of the application equipment?

Describe the condition of the equipment.

To assess if the equipment used for application is in good condition.
11
What was the temperature during the coating application?

Enter the temperature in degrees Celsius.

To ensure that the coating was applied within the specified temperature range.
Min: 15
Target: 20
Max: 25
12
Does the finish meet the quality standards?

Select the quality assessment.

To evaluate the quality of the applied finish for aerospace coatings.
13
Is the curing process compliant with specified standards?

Select compliance status.

To ensure the curing process meets industry requirements.
14
When was the last quality control review conducted for the coatings?

Enter the date of the last review.

To track the frequency of quality control assessments.
15
Was personal protective equipment (PPE) used by all personnel?

Select true if PPE was used, false otherwise.

To confirm that safety measures were implemented during the application.
16
What observations were noted during the paint application process?

Provide detailed observations.

To document any notable occurrences or issues during the process.
17
What is the measured viscosity of the paint?

Enter the viscosity in centipoise (cP).

To ensure the viscosity of the paint is within acceptable limits for application.
Min: 40
Target: 50
Max: 60
18
Is the surface preparation method used valid according to standards?

Select the validity status.

To verify that the surface preparation methods align with industry standards.
19
Is the coating application process compliant with relevant regulations?

Select compliance status.

To verify that all applicable regulations are being followed in the coating process.
20
When was the last training session for staff regarding coating application?

Enter the date of the last training session.

To ensure that staff are adequately trained and knowledgeable about current practices.
21
Were quality control checks performed during the application?

Select true if checks were performed, false otherwise.

To confirm that quality assurance processes were implemented throughout the application.
22
What were the environmental conditions during application?

Describe the temperature, humidity, and any other relevant conditions.

To assess how environmental factors may have influenced the application process.
23
What is the measured drying time of the coating?

Enter the drying time in minutes.

To ensure that the drying time is within the specified limits for optimal performance.
Min: 20
Target: 30
Max: 40
24
Do the adhesion test results meet the required standards?

Select the test result.

To ensure that the coating adheres properly to the substrate, which is critical for performance.
25
Is the hazard assessment process compliant with safety regulations?

Select compliance status.

To verify that the hazard assessment is conducted according to regulatory requirements.
26
When was the last safety audit conducted?

Enter the date of the last safety audit.

To track the frequency of safety audits and ensure consistent evaluations.
27
Has all relevant personnel completed incident reporting training?

Select true if training is complete, false otherwise.

To ensure that personnel are trained to report safety incidents effectively.
28
What notes were taken during the review of emergency procedures?

Provide detailed notes on the review.

To document the effectiveness of emergency procedures and identify any gaps.
29
How many safety incidents were reported during the coating application?

Enter the number of incidents.

To monitor safety performance and identify areas for improvement.
Min: 0
Target: 0
Max: 10
30
Is all required safety equipment available and in good condition?

Select the availability status.

To ensure safety protocols are met and personnel are protected during operations.

FAQs

The checklist addresses cleaning methods, abrasive blasting techniques, chemical treatments, and surface profile measurements to ensure proper coating adhesion.

It includes items on paint material storage, shelf life monitoring, mixing ratios, viscosity control, and proper documentation of paint batch information.

The checklist covers spray painting methods, electrostatic coating processes, powder coating techniques, and specialized application procedures for aerospace primers and topcoats.

It includes sections on oven curing parameters, infrared curing techniques, ambient curing conditions, and verification of proper cure through various testing methods.

The checklist addresses coating thickness measurements, adhesion testing, corrosion resistance evaluations, color and gloss verification, and environmental testing specific to aerospace coatings.

Benefits

Ensures compliance with NADCAP requirements for coatings and paint application in aerospace

Improves consistency and quality of surface finishes on aerospace components

Helps prevent coating defects and corrosion issues in critical aerospace parts

Enhances process control and documentation in painting and coating operations

Facilitates continuous improvement in surface finishing techniques and environmental compliance