Oil Refinery Turnaround and Shutdown Management Audit Checklist

A comprehensive checklist for auditing turnaround and shutdown management practices in oil refineries, covering planning, execution, safety, and post-turnaround evaluation processes.

Get Template

About This Checklist

Effective management of turnarounds and planned shutdowns is crucial for oil refineries to maintain operational integrity, improve efficiency, and minimize downtime. This comprehensive audit checklist is designed to evaluate the refinery's planning, execution, and post-turnaround processes for major maintenance and upgrade activities. Regular audits in this area are essential for optimizing turnaround performance, ensuring safety, controlling costs, and maximizing the value of these critical events in the refinery's lifecycle.

Learn more

Industry

Energy and Utilities

Standard

API RP 750 - Process Hazards Management

Workspaces

Oil refineries

Occupations

Turnaround Manager
Maintenance Superintendent
Project Engineer
Safety Coordinator
Procurement Specialist
1
Is the turnaround operation compliant with safety protocols?
2
What is the percentage of budget variance for the turnaround?
Min-100
Target0
Max100
3
What feedback did contractors provide about the execution process?
4
Was the critical path monitored effectively during the turnaround?
5
How effective was the maintenance planning during the turnaround?
6
What are the key findings from the post-turnaround evaluation?
7
What was the difference between scheduled and actual duration of the turnaround?
Min-100
Target0
Max100
8
What was the start date of the turnaround?
9
What documentation was prepared for the shutdown planning?
10
How effectively were shutdown tasks executed?
11
What percentage of resources were allocated effectively during the shutdown?
Min0
Target100
Max100
12
What was the completion date of the shutdown?
13
Was all emergency equipment available and operational during the turnaround?
14
What was the severity level of any safety incidents that occurred?
15
How many safety training sessions were conducted prior to the turnaround?
Min0
Target0
Max50
16
When was the review meeting held to discuss turnaround performance?

FAQs

The checklist covers turnaround planning processes, scope definition and control, contractor management, safety protocols, critical path scheduling, budget control, quality assurance, post-turnaround performance evaluation, and lessons learned documentation.

Comprehensive audits should be conducted before and after each major turnaround event, typically every 3-5 years, with additional reviews of turnaround planning processes annually.

The audit team should include turnaround managers, maintenance superintendents, project engineers, safety coordinators, procurement specialists, and operations representatives to ensure a holistic assessment of turnaround practices.

By systematically evaluating all aspects of turnaround management, the checklist helps identify areas for improvement in planning, execution, and post-turnaround processes, leading to more efficient, safer, and cost-effective turnaround events.

Audit findings should be thoroughly analyzed, shared with management and relevant stakeholders, used to develop improvement strategies for future turnarounds, and incorporated into the refinery's overall maintenance and reliability programs.

Benefits of Oil Refinery Turnaround and Shutdown Management Audit Checklist

Enhances turnaround planning and execution efficiency

Reduces overall turnaround duration and associated production losses

Improves safety performance during high-risk turnaround activities

Optimizes resource allocation and cost control for major maintenance events

Ensures regulatory compliance and equipment reliability post-turnaround